In 2021, the City reconstructed Godfrey Ave (Liberty St to Market St)Now that a year has passed since the project was completed, we want to know your thoughts. Your feedback will be used to inform future projects.

At the bottom of this page, please tap "Continue" to answer a few questions and provide your input. Thank you!

 

Project background

New street design:

Godfrey Avenue from Hall Street to Oxford Street

 

Godfrey Avenue (Liberty St to Hall St)

 

The project:

  • Separated a combined sewer into dedicated sanitary and storm sewers.
  • Replaced the water main and lead water service lines.

On Godfrey Avenue from Hall Street to Oxford Street:

  • Narrowed the street from 42 feet wide to 30 feet wide.
  • Maintained the parking lane on the west side of the street and remove the east side parking lane.
  • Install a 5-foot wide sidewalk for pedestrians next to a two-way bikeway on the east side of the street.    
  • Installed bulb-outs at some intersections to shorten the street crossing width for people walking, slow traffic speeds, and better define parking lanes.
  • Installed sidewalk and curb ramps compliant with the Americans with Disabilities Act on the west side of the street.
  • Planted new street trees.

On Godfrey Avenue from the south city limits to Hall Street:

  • Narrowed the street from approximately 40 feet wide to 32 feet wide to increase the amount of greenspace.
  • Installed bicycle lanes on both sides of the street, one in each direction.
  • Installed sidewalk and curb ramps compliant with the Americans with Disabilities Act on the both sides of the street.
  • Planted new street trees.

Before Reconstruction

After Reconstruction